Grosvenor 2 Waste Coal Mine Gas Power Station (GROSV2)

Coal · EDL Projects Australia Pty Ltd · Reciprocating Engine - Spark ignition

AEMO: removed QLD1 Fossil - Coal Seam Methane NEM data · 7 days
15 MW
Registered nameplate capacity
Est. SRMC
$14.55/MWh
Key information
Capacity
15 MW

AEMO status removed
Project status — (AI)

Region QLD1
Coordinates —

DUID GROSV2
Owner EDL Projects Australia Pty Ltd
Commissioned —
Expected closure 2025
Closure date —
Technology Reciprocating Engine - Spark ignition
Fuel Fossil - Coal Seam Methane
Equipment OEM —
Equipment type / model —
Stats window
18 Sep 2026 19:30 → 25 Sep 2026 19:30 AEST

Dispatch & revenue

18 Sep 2026 19:30 → 25 Sep 2026 19:30 AEST

No dispatch data for DUID GROSV2 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
15 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$14.55/MWh
Capex total (greenfield)
$32.09M

Shown in table
$32.09M (2026 real AUD)

Reported / source value
$30.42M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
—
Capex / MW derived
$2,109,705

Shown in table
$2.11M (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Grosvenor 2 is described by EDL as a 15 MW expansion at the Grosvenor site; EDL owns and operates Grosvenor 1 and 2. AEMO/Aurecon 2024 benchmark material indicates high-speed spark-ignition reciprocating engines fuelled by coal seam methane or waste gas typically have <50 MW installed capacity, but the report does not provide a plant-specific capex for Grosvenor 2. I therefore left capex fields null rather than infer from a benchmark. No verified source found for commissioned date beyond operation as an expansion in 2017.

Sources