Coal · EDL Projects Australia Pty Ltd · Reciprocating Engine - Spark ignition
03 Jun 2026 23:45 → 04 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$55.38M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$50,000
Shown in table |
| Variable OPEX / MWh default |
$3.00
Shown in table |
| Fuel cost / GJ default |
$6.00
Shown in table |
| Heat rate GJ/MWh default |
9.00
Shown in table |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Plant-specific greenfield capex was not found in searched owner/government sources. EDL confirms the Grosvenor 1 project was developed and built in 2015 and started operation in 2016, but no total project cost was located. Grosvenor 2 was a later expansion and is not included in capex_total_aud. Search results also contained unrelated 'Grosvenor Place' property results, which were ignored.