Other Generators · Lightsource Development Services Australia · Other - Other
13 Jun 2026 18:25 → 14 Jun 2026 18:25 AEST
| Capex total (greenfield) |
$1,687.76M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,109,705
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table How this was derived |
| Variable OPEX / MWh default |
$2.00
Shown in table How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield investment figure for Goorambat BESS (Lighthouse) was found in the searched official/developer sources. Available search results primarily related to other Lightsource bp projects (especially Goulburn River and Woolooga) or general company pages, so using a project-specific capex for this site would require further verification. Because the site is a battery project and no operating/fuel data were located, O&M, heat rate, fuel, and efficiency fields are left null rather than backfilled from unrelated technologies.