Coal · EDL OCI Pty Ltd · Reciprocating Engine - Spark ignition
13 Jun 2026 19:20 → 14 Jun 2026 19:20 AEST
| Capex total (greenfield) |
$33.70M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.18M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$248,477
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$14.55
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$6.00
Shown in table |
| Heat rate GJ/MWh default |
9.00
Shown in table |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
EDL/Clarke Energy sources confirm Glennies Creek is a waste coal mine gas reciprocating-engine station and give capacity/commissioning context (10 x 1 MW engines; site capacity around 10-12.78 MW; commissioning/handover in 2006-2007). No reliable source-backed greenfield capex figure was located, so capex remains unfilled rather than inferred from benchmarks. O&M benchmark values are drawn from the 2024 AEMO/Aurecon review for a hypothetical waste-gas plant, not a Glennies Creek-specific plant report.