03 Jun 2026 20:50 → 04 Jun 2026 20:50 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
I could not verify a plant-specific greenfield capex announcement for FNQ BESS 2 (KCI) / Solquartz Holdings Pty Ltd from the searched official and primary sources. The available Solquartz and Queensland/Townsville sources describe the broader Northern Quartz Campus / Supernode North concept and indicate battery storage capacity up to 750 MW / 6,000 MWh (or 780 MW in an EPBC referral), but they do not provide a project cost for this specific site. Because the site-specific capacity for FNQ BESS 2 was not verified in the sources retrieved, I did not derive capex, O&M, or per-unit cost assumptions from those broader precinct figures.