03 Jun 2026 22:25 → 04 Jun 2026 22:25 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table How this was derived |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific project investment/capex announcement found for FNQ BESS 1 (KCI). AEMO generation information confirms KCI data exists for the NEM, but the accessible page does not expose the project-level values in search results. Solquartz public/project pages and ARENA material found relate to a different Solquartz feasibility study (polysilicon), not this battery project. Capacity and commissioning date were not verified from primary sources in the available web results, so capex/O&M remain unfilled rather than inferred.