FNQ BESS 1 (KCI)

BESS · Solquartz Holdings Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.54/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

DUID
Owner Solquartz Holdings Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
03 Jun 2026 22:25 → 04 Jun 2026 22:25 AEST

Dispatch & revenue

03 Jun 2026 22:25 → 04 Jun 2026 22:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.54/MWh
Capex total (greenfield)

How this was derived
This is a polysilicon feasibility study, not the FNQ BESS 1 battery project; therefore not used as battery capex.

Reference
Solquartz – Townsville Green Polysilicon Feasibility Study (low confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage
$358,607

Shown in table
$358.6k (2026 real AUD)

Reported / source value
$350.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

How this was derived
Server-side internal default used because no plant-specific O&M source was found.

Variable OPEX / MWh
$1.54

Shown in table
$1.54 (2026 real AUD)

Reported / source value
$1.50 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side internal default used because no plant-specific variable O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific project investment/capex announcement found for FNQ BESS 1 (KCI). AEMO generation information confirms KCI data exists for the NEM, but the accessible page does not expose the project-level values in search results. Solquartz public/project pages and ARENA material found relate to a different Solquartz feasibility study (polysilicon), not this battery project. Capacity and commissioning date were not verified from primary sources in the available web results, so capex/O&M remain unfilled rather than inferred.