Eraring (ER02)

Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical

Closed AEMO: In Service - Announced Withdrawal (Permanent) NSW1 Fossil - Black Coal NEM data · 24 hours
720 MW
Registered nameplate capacity
24 hours revenue
$335.3k
Capacity factor
33.3%
Revenue / MWh
$58.26
Est. SRMC
$52.60/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
720 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

Region NSW1
MLF 0.9846
DUID ER02
Owner Origin Energy Eraring Pty Ltd
Commissioned
Expected closure 2025-07-02
Closure date 19 Aug 2027
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM
Turbine / boiler supplier
Stats window
03 Jun 2026 20:50 → 04 Jun 2026 20:50 AEST

Dispatch & revenue

03 Jun 2026 20:50 → 04 Jun 2026 20:50 AEST

Revenue (× MLF)
$335.3k
Dispatched
5,755.2 MWh
Available
5,133.3 MWh
Curtailed
2,210.4 MWh
Curtailment
43.1%
of available
MLF used
0.9846
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9855
2025-07-01 0.9846

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
720 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$52.60/MWh
Capex total (greenfield) default
$2,520.00M

Shown in table
$2,520.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$3,500,000

Shown in table
$3.50M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$4.00

Shown in table
$4.00 (2026 real AUD)

Fuel cost / GJ default
$4.50

Shown in table
$4.50 (2026 real AUD)

Heat rate GJ/MWh default
10.80

Shown in table
$10.80 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown