Gas Peakers · LMS Energy Pty Ltd · Reciprocating Engine - Spark ignition
16 May 2026 02:55 → 15 Jun 2026 02:55 AEST
| Capex total (greenfield) |
$120.83M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$26,911,392
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.18M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$262,943
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$14.55
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$6.33
Shown in table Reported / source value |
| Heat rate GJ/MWh |
9.00
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 07 Jun 2026
Notes
No project-specific greenfield capex announcement was found for EASTCRK2 or the Eastern Creek 2 Gas Utilisation Facility in the searched official/developer/government sources. O&M and operating assumptions were therefore anchored to AEMO's 2024 technology review hypothetical biogas/landfill-gas reciprocating-engine case, which indicates landfill gas/waste gas reciprocating engines in the NEM and provides a 2024 CAPEX/O&M benchmark. The facility appears to be part of the broader Eastern Creek Renewable Energy Facility / landfill gas systems at Eastern Creek, but no separately attributable capex for this DUID was located.