Eastern Creek 2 Gas Utilisation Facility (EASTCRK2)

Gas Peakers · LMS Energy Pty Ltd · Reciprocating Engine - Spark ignition

AEMO: removed NSW1 Renewable Biomass or Waste - Landfill Gas NEM data · 24 hours
4 MW
Registered nameplate capacity
Est. SRMC
$71.51/MWh
Key information
Capacity
4 MW

AEMO status removed
Project status (AI)

Region NSW1
Coordinates

DUID EASTCRK2
Owner LMS Energy Pty Ltd
Commissioned
Expected closure 2025
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Landfill Gas
Plant supplier
Boiler / turbine equipment
Stats window
13 Jun 2026 11:30 → 14 Jun 2026 11:30 AEST

Dispatch & revenue

13 Jun 2026 11:30 → 14 Jun 2026 11:30 AEST

No dispatch data for DUID EASTCRK2 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
4 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$71.51/MWh
Capex total (greenfield)
$120.83M

Shown in table
$120.83M (2026 real AUD)

Reported / source value
$114.55M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as fallback benchmark context only; no plant-specific capex evidence was located.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$26,911,392

Shown in table
$26.91M (2026 real AUD)

Reported / source value
$25.51M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark CAPEX intensity for a plausible waste-gas reciprocating-engine plant.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$1.18M

Shown in table
$1.18M (2026 real AUD)

Reported / source value
$1.12M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$262,943

Shown in table
$262.9k (2026 real AUD)

Reported / source value
$249.3k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M used because no site-specific O&M was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M used because no site-specific O&M was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ
$6.33

Shown in table
$6.33 (2026 real AUD)

Reported / source value
$6.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
9.00

Shown in table
$9.00 (2026 real AUD)

How this was derived
Fallback assumption only; not source-backed for EASTCRK2.

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 07 Jun 2026

Notes
No project-specific greenfield capex announcement was found for EASTCRK2 or the Eastern Creek 2 Gas Utilisation Facility in the searched official/developer/government sources. O&M and operating assumptions were therefore anchored to AEMO's 2024 technology review hypothetical biogas/landfill-gas reciprocating-engine case, which indicates landfill gas/waste gas reciprocating engines in the NEM and provides a 2024 CAPEX/O&M benchmark. The facility appears to be part of the broader Eastern Creek Renewable Energy Facility / landfill gas systems at Eastern Creek, but no separately attributable capex for this DUID was located.