Gas Peakers · LMS Energy Pty Ltd · Reciprocating Engine - Spark ignition
16 May 2026 06:20 → 15 Jun 2026 06:20 AEST
| Capex total (greenfield) |
$19.51M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,346,273
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$970.1k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$216,068
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$13.86
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$6.33
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
9.00
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific greenfield investment figure found for the 4 MW Eastern Creek Renewable Power Project associated with BINGO Industries' Eastern Creek Ecology Park; this appears to be the best available proxy for the Eastern Creek 2 Gas Utilisation Facility, but the source does not explicitly name the DUID or confirm the full 4.49 MW registered capacity. LMS Energy site pages confirm an Eastern Creek Utilisation Facility at Ferrers Road, Eastern Creek, but no project-specific capex was found there. O&M and performance defaults were taken from AEMO/Aurecon waste/gas technology parameters for waste-to-energy/gasification/landfill-gas style plants; the landfill-gas specific cost line item found in AEMO materials was used as a proxy.