Eastern Creek 2 Gas Utilisation Facility

Gas Peakers · LMS Energy Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service Renewable Biomass or Waste - Landfill Gas NEM data · 30 days
4 MW
Registered nameplate capacity
Est. SRMC
$70.82/MWh
Key information
Capacity
4 MW

AEMO status In Service
Project status Operational (AI)

Coordinates

DUID
Owner LMS Energy Pty Ltd
Commissioned
Expected closure 2042
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Landfill Gas
Plant supplier
Boiler / turbine equipment
Stats window
16 May 2026 06:20 → 15 Jun 2026 06:20 AEST

Dispatch & revenue

16 May 2026 06:20 → 15 Jun 2026 06:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
4 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$70.82/MWh
Capex total (greenfield)
$19.51M

Shown in table
$19.51M (2026 real AUD)

Reported / source value
$18.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported project investment for the Eastern Creek renewable power station used as the closest plant-specific capex proxy.

Reference
Eastern Creek Landfill Powers Up to Supply 7,000 Homes - LGI | Clean Energy & Carbon Abatement (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$4,346,273

Shown in table
$4.35M (2026 real AUD)

Reported / source value
$4.12M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW from reported total project investment and 4 MW project size.

Reference
Eastern Creek Landfill Powers Up to Supply 7,000 Homes - LGI | Clean Energy & Carbon Abatement (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
$970.1k

Shown in table
$970.1k (2026 real AUD)

Reported / source value
$919.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$216,068

Shown in table
$216.1k (2026 real AUD)

Reported / source value
$204.8k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon fixed O&M proxy for waste/gas-style generation.

Reference
Microsoft Word - 2023 Cost and Technical Parameters Review_Final Report.docx (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$13.86

Shown in table
$13.86 (2026 real AUD)

Reported / source value
$13.14 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon variable O&M proxy for waste/gas-style generation.

Reference
Microsoft Word - 2023 Cost and Technical Parameters Review_Final Report.docx (high confidence)
Source recorded 06 Jun 2026

Fuel cost / GJ
$6.33

Shown in table
$6.33 (2026 real AUD)

Reported / source value
$6.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific landfill-gas fuel price or contract terms were found; used provided fallback.

Heat rate GJ/MWh
9.00

Shown in table
$9.00 (2026 real AUD)

How this was derived
No plant-specific heat rate found; used provided fallback.

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Plant-specific greenfield investment figure found for the 4 MW Eastern Creek Renewable Power Project associated with BINGO Industries' Eastern Creek Ecology Park; this appears to be the best available proxy for the Eastern Creek 2 Gas Utilisation Facility, but the source does not explicitly name the DUID or confirm the full 4.49 MW registered capacity. LMS Energy site pages confirm an Eastern Creek Utilisation Facility at Ferrers Road, Eastern Creek, but no project-specific capex was found there. O&M and performance defaults were taken from AEMO/Aurecon waste/gas technology parameters for waste-to-energy/gasification/landfill-gas style plants; the landfill-gas specific cost line item found in AEMO materials was used as a proxy.