BESS · DERBY SOLAR PROJECT PTY LTD · Storage - Battery
04 Jun 2026 02:40 → 05 Jun 2026 02:40 AEST
| Capex total (greenfield) |
$107.07M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,127,049
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.75M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,443
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.20
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex figure was found in the searched owner/developer, government, or project sources. Public sources confirm the project as a 95 MW solar farm with battery storage, but the available search results only reference a broader Victorian project portfolio investment figure ($1.48 billion across six projects) and not a Derby-specific total project cost. AEMO/CSIRO GenCost was not used for capex because project-specific capex remains unfound. O&M defaults were applied only where no project-specific O&M data was found.