Coal · QGC Sales QLD Pty Ltd · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
15 Jun 2026 00:00 → 15 Jun 2026 06:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9729 |
| 2025-07-01 | 0.9724 |
| Capex total (greenfield) |
$270.70M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,749,134
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$2.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
7.29
Shown in table How this was derived Reference |
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Condamine A (CPSA) is the Condamine Power Station project; the available source describes the 140 MW project and estimated completion cost at A$170 million. The plant was later described as having open-cycle operation from February 2009 and closed-cycle commissioning from August/October 2009. No reliable source-backed plant-specific fixed O&M, variable O&M, or fuel price was found in the searched results, so these fields remain null.