Condamine A (CPSA)

Coal · QGC Sales QLD Pty Ltd · Turbine - Steam Sub Critical

Operational AEMO: In Service QLD1 Fossil - Coal Seam Methane NEM data · 24 hours
57 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$2.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
57 MW

AEMO status In Service
Project status Operational (AI)

Global Energy Monitor / Wikipedia identify Condamine Power Station as operating or in service; project is already generating.

Region QLD1
Coordinates -26.66360, 150.26500 (AI)

Wikidata/Wikipedia place Condamine Power Station near Miles at about 26°39'49"S 150°15'54"E.

MLF 0.9724
DUID CPSA
Owner QGC Sales QLD Pty Ltd
Commissioned
Expected closure 2039
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Coal Seam Methane
Equipment OEM Austrian Energy & Environment
Equipment type / model Combined-cycle steam and gas turbine power station (140 MW net)
Equipment confidence medium
Stats window
14 Jun 2026 03:35 → 15 Jun 2026 03:35 AEST

Dispatch & revenue

14 Jun 2026 03:35 → 15 Jun 2026 03:35 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9724
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9729
2025-07-01 0.9724

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
57 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
$270.70M

Shown in table
$270.70M (2026 real AUD)

Reported / source value
$170.00M (2008 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Plant-specific reported build cost proxy for the Condamine Power Station project.

Reference
AGL Energy Limited (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$4,749,134

Shown in table
$4.75M (2026 real AUD)

Reported / source value
$2.98M (2008 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from reported project cost and the user-provided 57 MW capacity.

Reference
AGL Energy Limited (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh
7.29

Shown in table
$7.29 (2026 real AUD)

How this was derived
Existing-generator static heat rate from AEMO heat-rate data.

Reference
Heat rates Encapsulates the efficiency of thermal generators (high confidence)
Source recorded 07 Jun 2026

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Condamine A (CPSA) is the Condamine Power Station project; the available source describes the 140 MW project and estimated completion cost at A$170 million. The plant was later described as having open-cycle operation from February 2009 and closed-cycle commissioning from August/October 2009. No reliable source-backed plant-specific fixed O&M, variable O&M, or fuel price was found in the searched results, so these fields remain null.