BESS · Pacific Hydro Clements Gap Pty Ltd · Storage - Battery
01 Jun 2026 00:00 → 14 Jun 2026 04:30 AEST
| Capex total (greenfield) |
$105.49M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$879,044
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.58M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Pacific Blue stated the project is a $100 million, 60 MW / 130 MWh grid-scale battery at Clements Gap; this is a reported project investment figure. Later Pacific Blue material describes the battery as 60 MW / 120 MWh, so the reported cost is paired here with the announced 60 MW project capacity and the 2024 construction start year. Operational lifespan noted by Pacific Blue is 20 years.