Gas Peakers · EDL LFG Vic Pty Ltd · Reciprocating Engine - Spark ignition
14 Jun 2026 07:30 → 15 Jun 2026 07:30 AEST
| Capex total (greenfield) |
$10.45M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$870,902
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.25M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$104,508
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$31.11
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh default |
9.00
Shown in table |
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 06 Jun 2026
Notes
Plant-specific greenfield construction cost was not found in available sources. Capex uses AEMO/GHD 2025 hypothetical landfill gas benchmark ($5,100/kW EPC) multiplied by 12 MW; this is an estimate, not a reported project cost. Clayton is an operating 12 MW landfill gas station commissioned in 1995. EDL reports ~53 GWh/year generation and operation with 11 Jenbacher 320 engines plus 1 Caterpillar engine.