Callide C (CPP_4)

Coal · Joint Venture; Callide Energy Pty Ltd and IG Power (Callide) Ltd. · Turbine - Steam Super Critical

Operational AEMO: In Service QLD1 Fossil - Black Coal NEM data · 24 hours
420 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$101.94/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
420 MW

AEMO status In Service
Project status Operational (AI)

Region QLD1
MLF 0.9222
DUID CPP_4
Owner Joint Venture; Callide Energy Pty Ltd and IG Power (Callide) Ltd.
Commissioned Apr 2025
Expected closure
Closure date
Technology Turbine - Steam Super Critical
Fuel Fossil - Black Coal
Steam turbine OEM
Turbine / boiler supplier
Stats window
03 Jun 2026 22:15 → 04 Jun 2026 22:15 AEST

Dispatch & revenue

03 Jun 2026 22:15 → 04 Jun 2026 22:15 AEST

Revenue (× MLF)
$0
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9222
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9160
2025-07-01 0.9222

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
420 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$101.94/MWh
Capex total (greenfield)
$771.52M

Shown in table
$771.52M (2026 real AUD)

Reported / source value
$800.00M (2001 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Reported plant-specific greenfield construction cost used as capex_total_aud.

Reference
Callide Coal-Fired Power Stations, Queensland - Power Technology (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$1,836,952

Shown in table
$1.84M (2026 real AUD)

Reported / source value
$947.9k (2001 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from reported total cost and CS Energy capacity figure.

Reference
Callide Coal-Fired Power Stations, Queensland - Power Technology (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$44.77M

Shown in table
$44.77M (2026 real AUD)

Reported / source value
$23.10M (2001 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated annual fixed O&M from fallback rate and registered DUID capacity.

Fixed OPEX / MW-yr
$106,589

Shown in table
$106.6k (2026 real AUD)

Reported / source value
$55.0k (2001 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal fallback default supplied by user; no plant-specific fixed O&M source found in search results.

Variable OPEX / MWh
$7.75

Shown in table
$7.75 (2026 real AUD)

Reported / source value
$4.00 (2001 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal fallback default supplied by user; no plant-specific variable O&M source found in search results.

Fuel cost / GJ
$8.72

Shown in table
$8.72 (2026 real AUD)

Reported / source value
$4.50 (2001 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal fallback default supplied by user; no plant-specific coal contract price found in search results.

Heat rate GJ/MWh
10.80

Shown in table
$10.80 (2026 real AUD)

How this was derived
Internal fallback default supplied by user; no plant-specific heat-rate source found in search results.

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Callide C was commissioned in 2001 and has a capacity of 844 MW (two units: C3 424 MW and C4 420 MW). A reported project cost of A$800 million was found in secondary project-reference material; no owner press release with the original capex figure was located in the search results. Unit C4 was rebuilt and returned to service in August 2024; that rebuild is not included in capex_total_aud.