Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9188 |
| 2025-07-01 | 0.9252 |
| Capex total (greenfield) |
$1,292.19M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$89.66M
Shown in table Reported / source value The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source. Reference |
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$20.31M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$4.22
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$4.75
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.80
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No reliable plant-specific greenfield construction cost for Callide B was found in the searched official/primary sources. CS Energy confirms Callide B was commissioned in 1988 and is fully owned by CS Energy. A CS Energy annual report and news release confirm an $85 million Callide B overhaul/capital works program completed in December 2024, which is refurbishment rather than original capex. Fallback operating assumptions were used from the provided internal defaults.