Browns Plains (BPLANDF1)

Other Generators · EDL LFG (Qld) Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service QLD1 Other - Other NEM data · 24 hours
2 MW
Registered nameplate capacity
Est. SRMC
$2.00/MWh
Key information
Capacity
2 MW

AEMO status In Service
Project status Operational (AI)

Region QLD1
Coordinates

DUID BPLANDF1
Owner EDL LFG (Qld) Pty Ltd
Commissioned
Expected closure 2050
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Other - Other
Equipment OEM
Equipment type / model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

No dispatch data for DUID BPLANDF1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
2 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
$2.17M

Shown in table
$2.17M (2026 real AUD)

Reported / source value
$2.06M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$996,787

Shown in table
$996.8k (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex, refurbishment cost, O&M, fuel, heat-rate, emissions, or asset-life figures were found in the searched sources. EDL and AEMO sources located the Browns Plains landfill gas power station / spark ignition reciprocating engine and the ACCU project reference, but did not disclose investment cost or operating assumptions. Internal defaults were not applied because the instruction required web-backed sourcing and plant-specific capex search first.