Braemar (BRAEMAR2)

Coal · Braemar Power Project Pty Ltd · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Coal Seam Methane NEM data · 24 hours
188 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$130.94/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
188 MW

AEMO status In Service
Project status Operational (AI)

Power Technology (2024) and Wikipedia: Braemar-2 commissioned August 2009 / currently operational.

Region QLD1
Coordinates -27.11000, 150.90500 (AI)

Wikipedia coordinates for Braemar Power Station: 27°06′36″S 150°54′18″E (-27.11000, 150.90500).

MLF 0.9667
DUID BRAEMAR2
Owner Braemar Power Project Pty Ltd
Commissioned
Expected closure 2046
Closure date
Technology Turbine - OCGT
Fuel Fossil - Coal Seam Methane
Equipment OEM Siemens
Equipment type / model SGT5-2000E
Secondary OEM Siemens
Secondary equipment SGen5-100A
Equipment confidence high
Stats window
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Dispatch & revenue

13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
3,540.7 MWh
Curtailed
3,540.7 MWh
Curtailment
100.0%
of available
MLF used
0.9667
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9627
2025-07-01 0.9667

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
188 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$130.94/MWh
Capex total (greenfield)
$237.97M

Shown in table
$237.97M (2026 real AUD)

Reported / source value
$225.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Searches of owner/developer and general web results did not surface a reliable project-specific capital cost figure for BRAEMAR2/Braemar.

Capex refurbishment
Capex / MW derived
$1,265,823

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$1.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.86M

Shown in table
$2.86M (2026 real AUD)

Reported / source value
$2.73M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$15,190

Shown in table
$15.2k (2026 real AUD)

Reported / source value
$14.4k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Large-unit OCGT fixed O&M benchmark from the 2024 report.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$4.94

Shown in table
$4.94 (2026 real AUD)

Reported / source value
$4.68 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Large-unit OCGT variable O&M benchmark from the 2024 report.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No reliable plant-specific greenfield capital cost announcement for Braemar Power Project Pty Ltd / BRAEMAR2 was found in the searched sources, so capex is left null rather than inferred from benchmarks. Fixed O&M was estimated from the 2024 AEMO/Aurecon OCGT large-unit parameter ($14,066/MW-net-year) and scaled to 188 MW. Variable O&M used the 2024 AEMO/Aurecon OCGT large-unit parameter ($4.68/MWh-net).

Sources