Bolivar Waste Water Treatment (BOLIVAR1)

Other Generators · South Australian Water Corporation · Reciprocating Engine - Spark ignition

AEMO: removed SA1 Renewable Biomass or Waste - Biogas NEM data · 349h
8 MW
Registered nameplate capacity
Est. SRMC
$58.40/MWh
Key information
Capacity
8 MW

AEMO status removed
Project status (AI)

Region SA1
Coordinates

DUID BOLIVAR1
Owner South Australian Water Corporation
Commissioned
Expected closure 2025
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Biogas
Plant supplier
Boiler / turbine equipment
Stats window
01 Jun 2026 00:00 → 15 Jun 2026 13:25 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 15 Jun 2026 13:25 AEST

No dispatch data for DUID BOLIVAR1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
8 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$58.40/MWh
Capex total (greenfield)
$74.77M

Shown in table
$74.77M (2026 real AUD)

Reported / source value
$64.00M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
$15.37M

Shown in table
$15.37M (2026 real AUD)

Reported / source value
$15.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is a later reported upgrade expenditure, also not original greenfield capex.

Reference
SAWater - Financial performance (high confidence)
Source recorded 05 Jun 2026

Capex / MW derived
$9,968,847

Shown in table
$9.97M (2026 real AUD)

Reported / source value
$8.53M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$384.2k

Shown in table
$384.2k (2026 real AUD)

Reported / source value
$3.75M (2025 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$51,230

Shown in table
$51.2k (2026 real AUD)

Reported / source value
$50.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because no plant-specific or source-backed fixed O&M value was found.

Variable OPEX / MWh
$3.07

Shown in table
$3.07 (2026 real AUD)

Reported / source value
$3.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because no plant-specific or source-backed variable O&M value was found.

Fuel cost / GJ
$6.15

Shown in table
$6.15 (2026 real AUD)

Reported / source value
$6.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because no plant-specific or source-backed fuel cost value was found.

Heat rate GJ/MWh
9.00

Shown in table
$9.00 (2026 real AUD)

How this was derived
Server-side fallback used because no plant-specific or source-backed heat rate value was found.

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
SA Water reported a $64 million upgrade of Bolivar WWTP underway in 2022, but this appears to be a brownfield upgrade rather than original greenfield construction. SA Water also reported a $15.1 million Bolivar WWTP capacity growth upgrade in 2024-25. No plant-specific original commissioning capex for the BOLIVAR1 biogas reciprocating engines was found in the searched sources, so capex_total_aud is based on the reported upgrade figure only and should be reviewed if a true original build cost is required.

Sources

  • capex_refurbishment_audSAWater - Financial performance (high)
  • emissions_intensity_tco2_mwh (low)
  • fixed_opex_per_mw_year_aud (low)
  • fuel_cost_per_gj_aud (low)
  • heat_rate_gj_per_mwh (low)
  • site_contextBolivar WWTP | SA Water (medium)
  • variable_opex_per_mwh_aud (low)