Other Generators · South Australian Water Corporation · Reciprocating Engine - Spark ignition
01 Jun 2026 00:00 → 15 Jun 2026 13:25 AEST
| Capex total (greenfield) |
$74.77M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$15.37M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$9,968,847
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$384.2k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$51,230
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$3.07
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$6.15
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
9.00
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
SA Water reported a $64 million upgrade of Bolivar WWTP underway in 2022, but this appears to be a brownfield upgrade rather than original greenfield construction. SA Water also reported a $15.1 million Bolivar WWTP capacity growth upgrade in 2024-25. No plant-specific original commissioning capex for the BOLIVAR1 biogas reciprocating engines was found in the searched sources, so capex_total_aud is based on the reported upgrade figure only and should be reviewed if a true original build cost is required.