Owner: South Australian Water Corporation
Status:
Technology Type: Reciprocating Engine - Spark ignition
Fuel Type: Renewable Biomass or Waste - Biogas
DUID: BOLIVAR1
Capacity: 0 MW
Full Commercial Use Date:
Expected Closure Year:
Closure Date:
29 May 2026 04:00 → 30 May 2026 04:00 AEST · data through 30 May 2026, 04:00
| Capex total | — |
|---|---|
| Capex / MW default | $2,500,000 |
| Capex / MWh storage | — |
| Fixed OPEX (annual) | — |
| Fixed OPEX / MW-yr default | $50,000 |
| Variable OPEX / MWh default | $3.00 |
| Fuel cost / GJ default | $6.00 |
| Heat rate GJ/MWh default | 9.00 |
Confidence: unknown · Status: needs review · Capex basis: unknown