Blowering (BLOWERNG)

Other Generators · Snowy Hydro Ltd · Hydro - Dam

Operational AEMO: In Service NSW1 Hydro - Water NEM data · 24 hours
80 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
80 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
MLF 0.9209
DUID BLOWERNG
Owner Snowy Hydro Ltd
Commissioned
Expected closure 2070-07-02
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
03 Jun 2026 19:25 → 04 Jun 2026 19:25 AEST

Dispatch & revenue

03 Jun 2026 19:25 → 04 Jun 2026 19:25 AEST

Revenue (× MLF)
$0
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9209
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9141
2025-07-01 0.9209

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
80 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$337.55M

Shown in table
$337.55M (2026 real AUD)

Reported / source value
$320.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.69M

Shown in table
$1.69M (2026 real AUD)

Reported / source value
$1.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the AEMO/ETC review assumption for conventional hydropower fixed O&M (variable O&M set to 0). Applied to Blowering capacity (80 MW) for fixed_opex_annual_aud.

Reference
2025 Energy Technology Cost and Technical Parameter Review (draft) - GHD for AEMO (high confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Set variable_opex_per_mwh_aud to 0 per AEMO/ETC review hydro assumption.

Reference
2025 Energy Technology Cost and Technical Parameter Review (draft) - GHD for AEMO (high confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
Hydro fuel/heat-rate not populated due to lack of accessible AEMO Hydro Dam-specific benchmark values in the retrieved sources; fixed O&M populated using AEMO/ETC review conventional hydropower assumption (fixed only; variable O&M not meaningful for hydro). Refurbishment capex and greenfield construction year not found in provided sources; commissioning date not populated.

Sources