BESS · FRV Services Australia Pty Ltd · Storage - Battery
13 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$759.5k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$3,797
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No project-specific greenfield capex announcement was found for BIRKBESS in the searched owner/developer, government, or project finance sources, so no capex value is reported. Capacity is inferred from the NEM generator listing as 200 MW / 400 MWh. Fixed O&M is estimated from the 2024 AEMO/Aurecon review battery benchmark of $3,600/MW-year for a 200 MW BESS, giving $720,000/year. Variable O&M assumed nil for battery storage. Asset life based on AEMO utility-scale solar farm assumption of 40 years; this is a generic planning assumption and may not reflect battery-specific warranty life.