Beryl Solar Farm (BERYLSF1)

Solar · FS NSW Project No 1 AT Pty Ltd as trustee of FS NSW Project No 1 Asset Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
98 MW
Registered nameplate capacity
24 hours revenue
$1.2k
Capacity factor
1.3%
Revenue / MWh
$41.03
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
98 MW
AEMO status In Service
Project status Operational (AI)

Region NSW1
MLF 0.9284
DUID BERYLSF1
Owner FS NSW Project No 1 AT Pty Ltd as trustee of FS NSW Project No 1 Asset Trust
Commissioned May 2019
Expected closure 2025-07-02
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 18:10 → 04 Jun 2026 18:10 AEST

Dispatch & revenue

03 Jun 2026 18:10 → 04 Jun 2026 18:10 AEST

Revenue (× MLF)
$1.2k
Dispatched
30.2 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9284
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9182
2025-07-01 0.9284

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
98 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$127.92M

Shown in table
$127.92M (2026 real AUD)

How this was derived
No source-backed capex information located for Beryl Solar Farm.

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)

How this was derived
No source-backed fixed O&M information located for Beryl Solar Farm.

Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ

How this was derived
Solar PV does not have fuel costs, but no generator-specific document was located.

Heat rate GJ/MWh

Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026

Notes
No web search results were returned for Beryl Solar Farm, so generator-specific financial/operating assumptions could not be source-backed. Only basic identity information and online year were used. Solar PV has no fuel cost and zero direct operational emissions; all other financial fields remain unavailable without source-backed evidence.

Sources

  • capex_total_aud (low)
  • emissions_intensity_tco2_mwh (medium)
  • fixed_opex_annual_aud (low)
  • fuel_cost_per_gj_aud (medium)