Bayswater (BW04)

Coal · AGL Macquarie Pty Limited · Turbine - Steam Sub Critical

Operational AEMO: In Service NSW1 Fossil - Black Coal NEM data · 24 hours
685 MW
Registered nameplate capacity
24 hours revenue
$418.5k
Capacity factor
45.8%
Revenue / MWh
$55.64
Est. SRMC
$55.48/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
685 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
MLF 0.9632
DUID BW04
Owner AGL Macquarie Pty Limited
Commissioned
Expected closure 2025-07-02
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM
Turbine / boiler supplier
Stats window
03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Dispatch & revenue

03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Revenue (× MLF)
$418.5k
Dispatched
7,521.9 MWh
Available
3,767.5 MWh
Curtailed
890.8 MWh
Curtailment
23.6%
of available
MLF used
0.9632
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9663
2025-07-01 0.9632

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
685 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$55.48/MWh
Capex total (greenfield)
$2,529.01M

Shown in table
$2,529.01M (2026 real AUD)

Reported / source value
$2,397.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source.

Reference
Bayswater Power Station upgrade secures additional energy supply for NSW (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
$264.55M

Shown in table
$264.55M (2026 real AUD)

Reported / source value
$200.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Additional brownfield maintenance and unit-specific spend.

Reference
AGL's generation assets ready for summer season (medium confidence)
Source recorded 04 Jun 2026

Capex / MW derived
$3,691,983

Shown in table
$3.69M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source.

Reference
Bayswater Power Station Turbine Efficiency Upgrade - Environmental Impact Statement (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$19.18M

Shown in table
$19.18M (2026 real AUD)

How this was derived
Annual fixed O&M is derived by applying the AEMO/GHD large black-coal subcritical fixed O&M estimate to the user-provided 685 MW capacity for BW04.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$28,000

Shown in table
$28.0k (2026 real AUD)

How this was derived
No BW04 fixed O&M disclosure was found; AEMO/GHD technology estimate for large black-coal subcritical plant is used.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$4.22

Shown in table
$4.22 (2026 real AUD)

Reported / source value
$4.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No site-specific variable O&M found in searched results; using provided fallback.

Fuel cost / GJ
$4.75

Shown in table
$4.75 (2026 real AUD)

Reported / source value
$4.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No delivered coal cost found in searched results; using provided fallback.

Heat rate GJ/MWh
10.80

Shown in table
$10.80 (2026 real AUD)

How this was derived
No source-specific heat rate found in searched results; using provided fallback.

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No specific financial data available for Bayswater. Estimates and defaults may be applied in absence of specific values.

Latest AI note (4 Jun 2026)

No verified greenfield original construction cost for Bayswater/BW04 was found in the searched sources. The available sources support only brownfield maintenance/upgrade spend, including AGL's announced >$200 million Bayswater upgrade over four years starting in 2018 and $70 million of completed works in 2019; a 2023 AGL update also referenced $190 million in Bayswater maintenance programs and $120 million on unit one. Bayswater was commissioned in 1985 and acquired by AGL in 2014.

View 4 earlier AI notes
4 Jun 2026

Bayswater Unit 4 (BW04) is one of four units at Bayswater. Public sources provide station-level rather than BW04-specific economics. Original 1980s construction cost was not found in accessible official sources. The capex value shown is an estimated one-quarter allocation of AGL's reported >AUD200m 2018 Bayswater turbine upgrade and ongoing outage-capex program, not original construction capex. Fixed and variable O&M are technology-default estimates for large black-coal subcritical plant without CCS from GHD/AEMO 2025; annual fixed opex is calculated as 685 MW × AUD28,000/MW-year. Asset life is calculated from 1985 commissioning to scheduled closure by end-2033; Nexa notes AEMO's generic technical-life assumption was 50 years and the original expected closure was 2035. Heat rate is AEMO station-level heat-rate data for Bayswater, not DUID-specific. Emissions intensity is AGL FY22 sent-out intensity for AGL Macquarie Bayswater; CER defines its own facility intensity on production rather than sent-out basis, and later CER/third-party values may differ.

4 Jun 2026

Capex_total_aud is not original 1980s construction cost. No reliable public source was found for original Bayswater construction capex; the value used is AGL's reported 2018 station upgrade/maintenance program of more than $200m, which improved capacity/efficiency and is station-wide, not BW04-only. A 2016 AGL project separately reported $63m for a station-wide distributed control system. Fixed and variable O&M are default technology assumptions from AEMO/GHD 2019 black-coal-without-CCS cost parameters in real 2018-19 AUD, applied to BW04's 685 MW capacity; they are not reported Bayswater unit accounts. Heat rate is AEMO's Bayswater static heat rate. Efficiency is calculated from heat rate using HHV efficiency = 3.6 / 9.45 = 38.1%; a parliamentary source reports a lower sent-out HHV efficiency of 35.9%. Emissions intensity uses the Bayswater EIS range of about 0.93-0.95 tCO2e/MWh sent-out; 0.94 is the midpoint. Asset life reflects commissioning in 1985 and AGL's current target closure by end-2033; the 2018 EIS stated a 50-year technical life to 2035, but AGL's current closure schedule is earlier.

4 Jun 2026

BW04-specific construction capex was not found. capex_total_aud is an estimate: half of the official June-1979 $590 million cost estimate for the first stage of Bayswater comprising 2 x 660 MW units and associated coal/water supplies. This may not correspond exactly to Unit 4/BW04. Fixed and variable O&M are station-level AEMO/Jacobs assumptions from a 2016 AEMO retail price modelling input table and are applied to the 685 MW unit capacity. Fuel cost is an AEMO 2024 ISP Bayswater assumption cited in IEEFA's submission and may differ from AGL's actual realised coal costs. Heat-rate sources differ: the 2016 AEMO/Jacobs table shows 10.00 GJ/MWh sent-out, while later AEMO/IEEFA material shows about 9.4-9.45 GJ/MWh; the profile uses 9.45 GJ/MWh. Emissions intensity uses Clean Energy Regulator 2023-24 facility data for Bayswater. Asset life is inferred from commissioning in 1985 and AGL's target closure by end-2033. Major refurbishment/maintenance notes include the $150 million turbine efficiency upgrade, $63 million DCS project, $35.9 million environmental/ash/water upgrade approval, and $130 million 2025 major Bayswater outage.

4 Jun 2026

Unit-specific BW04 construction capex was not found. The capex profile uses the reported June-1979 Bayswater first-stage estimate of AUD 590m for 2 x 660 MW plus associated coal and water supplies, converted to AUD/MW and allocated to the requested 685 MW unit; therefore capex_basis is estimated and nominal 1979 dollars are preserved. Fixed and variable O&M are from AEMO/Jacobs modelling assumptions for Bayswater and are not recent AGL reported actuals. Fuel cost per GJ is inferred from AGL FY25 portfolio coal fuel cost per MWh and AEMO heat rate, and should be reviewed against confidential coal contracts. Bayswater's targeted closure by end-2033 implies roughly 47-48 years from 1985-86 commissioning; AGL states the station will be approximately 50 years old by closure. Major refurbishment/upgrade notes include AUD 63m DCS/control-system works approved in 2016 and more than AUD 200m turbine efficiency/maintenance upgrade from 2018, intended to add 100 MW without additional coal consumption or emissions; AGL later reports 3 x 25 MW upgrades in its capacity metrics.