Bayswater (BW03)

Coal · AGL Macquarie Pty Limited · Turbine - Steam Sub Critical

Operational AEMO: In Service NSW1 Fossil - Black Coal NEM data · 24 hours
685 MW
Registered nameplate capacity
24 hours revenue
$421.9k
Capacity factor
45.7%
Revenue / MWh
$56.19
Est. SRMC
$28.68/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
685 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
MLF 0.9632
DUID BW03
Owner AGL Macquarie Pty Limited
Commissioned
Expected closure 2025-07-02
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Toshiba
Turbine / boiler supplier Toshiba steam turbine/boiler package
Equipment confidence high
Stats window
03 Jun 2026 21:20 → 04 Jun 2026 21:20 AEST

Dispatch & revenue

03 Jun 2026 21:20 → 04 Jun 2026 21:20 AEST

Revenue (× MLF)
$421.9k
Dispatched
7,508.8 MWh
Available
4,680.8 MWh
Curtailed
1,001.7 MWh
Curtailment
21.4%
of available
MLF used
0.9632
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9663
2025-07-01 0.9632

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
685 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$28.68/MWh
Capex total (greenfield)
$2,529.01M

Shown in table
$2,529.01M (2026 real AUD)

Reported / source value
$2,397.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported station-level capex for the turbine efficiency upgrade; used as reported capex because original construction cost was not found.

Reference
Bayswater Power Station upgrade secures additional energy supply for NSW (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
$264.55M

Shown in table
$264.55M (2026 real AUD)

Reported / source value
$200.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is a brownfield upgrade/maintenance program, so it is recorded as refurbishment rather than original capex.

Reference
Bayswater Power Station upgrade secures additional energy supply for NSW (high confidence)
Source recorded 04 Jun 2026

Capex / MW derived
$3,691,983

Shown in table
$3.69M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The source gives both the first-stage cost and capacity scope. Per-MW capex is calculated from those reported figures.

Reference
Transcript 5211 - Infrastructure Financing Guidelines, Bayswater Electricity Project (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$44.42M

Shown in table
$44.42M (2026 real AUD)

How this was derived
AI calculation using sourced fixed O&M unit rate and the user-provided BW03 capacity of 685 MW.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$64,851

Shown in table
$64.9k (2026 real AUD)

How this was derived
Default fixed O&M benchmark used because BW03-specific fixed O&M is not publicly reported. Technology is new AUSC coal, so applicability to ageing subcritical Bayswater is approximate.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$4.68

Shown in table
$4.68 (2026 real AUD)

How this was derived
Default variable O&M benchmark used because BW03-specific variable O&M is not publicly reported. Applicability to ageing subcritical plant is approximate.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$2.54

Shown in table
$2.54 (2026 real AUD)

How this was derived
Uses AEMO coal-price assumption for Bayswater as cited in a stakeholder submission; not a direct AGL contract price.

Reference
IEEFA submission to Draft 2024 ISP consultation (medium confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh
9.45

Shown in table
$9.45 (2026 real AUD)

How this was derived
Existing-generator heat-rate assumption for Bayswater; applied to BW03 as a Bayswater unit.

Reference
Heat rates - Encapsulates the efficiency of thermal generators (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
Bayswater BW03-specific historical construction capex and O&M were not found publicly. The capex estimate applies the reported 1979 Bayswater first-stage cost of $590m for 2 x 660 MW to the current 685 MW BW03 capacity; the original cost is preserved in nominal June 1979 AUD and was not escalated. Fixed and variable O&M use a default AEMO/Aurecon black-coal technology assumption because station/unit-specific fixed and variable O&M were not disclosed. Bayswater has had major sustaining and reliability works: AGL approved a $63m distributed control system project in 2016, announced a >$200m turbine/maintenance upgrade in 2018, and ABC reported >$130m planned maintenance for one unit in September 2025 on a four-year cycle. AGL says Bayswater was commissioned in 1985 and is scheduled to close by the end of 2033, implying about 48 years of operating life for station-level assumptions; NSW assessment documents also previously referred to operational life up to 2035. The emissions intensity field uses the post-upgrade sent-out basis range of 0.89-0.90 tCO2e/MWh from the Bayswater turbine efficiency upgrade EIS; historical pre-upgrade sent-out intensity was 0.93-0.95 tCO2e/MWh.

Latest AI note (4 Jun 2026)

Bayswater was commissioned in 1985-86 and AGL has announced the station will close between 2030 and 2033 (no later than 2033/FY34). The captured $200 million figure is a major upgrade/maintenance program, not greenfield capex. No reported original construction cost was found in the searched official sources.

View 2 earlier AI notes
4 Jun 2026

Original 1980s construction capex for Bayswater/BW03 was not found in public sources during this search. The capex field uses AGL's reported more-than-AUD 200 million Bayswater turbine efficiency upgrade announced in 2018 for the whole Bayswater station, not original construction cost and not unit-specific to BW03. AGL also reported a separate AUD 63 million distributed control system project approved in 2016 and AUD 70 million completed first-stage systems work in 2019. Fixed O&M and variable O&M are not publicly reported for BW03; values are default estimates from AEMO/Aurecon 2024 coal technology assumptions, applied to the 685 MW unit capacity. Heat rate is AEMO's existing-generator static heat rate for Bayswater. Efficiency is calculated as 3.6 / 9.45 = 38.1% HHV. Emissions intensity uses FY2024-25 NGER-derived facility intensity from gridIQ/CER; CER FY2023-24 official table reported 0.88 tCO2-e/MWh, broadly consistent. Closure timing has changed: older upgrade approvals referenced a 2035 planned technical life, while AGL's current Hunter Region page says Bayswater is scheduled to close by the end of 2033.

4 Jun 2026

Capex is not exact BW03 construction cost. The only located original public capex source is the 1979 Commonwealth/Loan Council estimate for Bayswater first stage: AUD 590m in June 1979 prices for 2 x 660 MW units plus associated coal and water supplies. I allocated this equally to one original 660 MW unit, giving AUD 295m per unit and AUD 446,970/MW. A later Bayswater turbine efficiency upgrade was reported at about AUD 150m over four years for all four units, increasing each unit from 660 MW to 685 MW; allocated pro-rata this is about AUD 37.5m per unit, but it is treated as refurbishment, not original construction capex. Fixed and variable O&M are technology default estimates for large black-coal sub-critical without CCS from the 2025 GHD/AEMO O&M review, not Bayswater-specific accounting data. Emissions intensity is derived from Bayswater 2015-16 reported sent-out intensity of 945 kgCO2-e/MWh less the reported approximately 37 kgCO2-e/MWh improvement expected from the turbine upgrade. Current AGL closure target is by end-2033, implying about 48 years from 1985 commissioning; earlier AGL documents referred to end of technical life/closure in 2035.