Barker Inlet Power Station (BARKIPS1)

Other Generators · AGL Barker Inlet Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service SA1 Fossil - Natural Gas Pipeline NEM data · 24 hours
210 MW
Registered nameplate capacity
24 hours revenue
$-41
Capacity factor
0.1%
Revenue / MWh
$-7.31
Est. SRMC
$9.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
210 MW
AEMO status In Service
Project status Operational (AI)

Region SA1
MLF 0.9996
DUID BARKIPS1
Owner AGL Barker Inlet Pty Ltd
Commissioned Jan 2020
Expected closure 2025-07-02
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Fossil - Natural Gas Pipeline
Equipment OEM
Equipment type / model
Stats window
03 Jun 2026 18:30 → 04 Jun 2026 18:30 AEST

Dispatch & revenue

03 Jun 2026 18:30 → 04 Jun 2026 18:30 AEST

Revenue (× MLF)
$-41
Dispatched
5.7 MWh
Available
1,517.7 MWh
Curtailed
1,517.7 MWh
Curtailment
100.0%
of available
MLF used
0.9996
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 1.0001
2025-07-01 0.9996

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
210 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$9.00/MWh
Capex total (greenfield)
$295.00M

Shown in table
$295.00M (2026 real AUD)

How this was derived
Primary owner announcement reports nominal project investment of AUD 295 million for a 210 MW Barker Inlet reciprocating-engine power station.

Reference
AGL announces development of $295m power station in SA (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$1,404,762

Shown in table
$1.40M (2026 real AUD)

How this was derived
Derived unit capex equals AUD 1.405m/MW on the reported nominal project cost and capacity.

Reference
AGL announces development of $295m power station in SA (high confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$7.56M

Shown in table
$7.56M (2026 real AUD)

How this was derived
Annual fixed O&M is an estimated technology assumption, not an AGL-reported Barker Inlet cost.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$36,000

Shown in table
$36.0k (2026 real AUD)

How this was derived
Used as a technology-specific estimate for Barker Inlet because GHD’s 210 MW dual-fuel reciprocating-engine scenario closely matches Barker Inlet.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$9.00

Shown in table
$9.00 (2026 real AUD)

How this was derived
Used as estimated VOM for the Barker Inlet technology class.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$13.58

Shown in table
$13.58 (2026 real AUD)

How this was derived
Used as a current market proxy because Barker Inlet-specific gas contract prices were not publicly found.

Reference
East coast gas supply outlook worsens July to September 2025, but forward longer-term prices ease (medium confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh
8.79

Shown in table
$8.79 (2026 real AUD)

How this was derived
Selected as the most suitable plant-level net heat-rate assumption for Barker Inlet-style reciprocating engines.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Reported capex is AGL's nominal $295 million investment announced in June 2017 and reiterated at construction commencement in February 2018 for a 210 MW, 12-engine Barker Inlet Power Station. AGL's current site says construction commenced in early 2018 and the plant was commissioned in late 2019; South Australian government material states BIPS was commissioned on 4 November 2019, while the provided online date is 2020-01-01. Fixed O&M, variable O&M, heat rate, efficiency, emissions factor and asset life are not publicly disclosed by AGL at generator level; values used are AEMO/GHD defaults for a new-entrant 12 x Wärtsilä reciprocating gas engine plant and should be reviewed if confidential AGL bid/asset data is available. Emissions intensity is calculated as 8.85 GJ/MWh times 53.53 kg CO2e/GJ combustion emissions = 0.474 tCO2e/MWh, excluding upstream fugitive emissions; including GHD's fugitive range of 3.9-13.5 kg CO2e/GJ would imply about 0.508-0.593 tCO2e/MWh. AGL/AECOM 2025 planning material states existing BIPS 1 is fully operational and that AGL is progressing a BIPS 2 variation, with development cost about $500 million and output up to 280 MW; this is expansion/development context, not a closure or refurbishment of BIPS 1. No major refurbishment or closure date for BIPS 1 was found in public sources.

Latest AI note (4 Jun 2026)

Capex is reported nominal AGL project cost for a 210 MW reciprocating-engine gas plant announced/developed in 2017 and under construction in 2018. Capex per MW is calculated as AUD 295m / 210 MW. O&M values are not Barker Inlet actuals; they use AEMO/GHD 2025 bottom-up estimates for a NEM-connected 210 MW dual-fuel reciprocating engine scenario (12 x Wärtsilä 18V50DF), which closely matches Barker Inlet. Aurecon’s 2024 technology review gives a lower fixed O&M assumption of AUD 29,383/MW-year and variable O&M of AUD 8.51/MWh for a similar 209.1 MW net hypothetical project; the GHD 2025 estimate was selected as the profile value because it is a newer AEMO-commissioned O&M review for existing NEM-connected gas technologies. Heat rate and efficiency use Aurecon’s net HHV maximum-load values for the same 12 x 18V50DF-style reciprocating-engine configuration; Wärtsilä’s OEM engine data shows a lower engine-only 50 Hz gas heat rate of 7,285 kJ/kWh and 49.4% electrical efficiency. Emissions intensity is estimated, not directly reported, as 8.79 GJ/MWh HHV net multiplied by the Australian NGA 2024 scope 1 natural gas pipeline factor of 51.53 kg CO2-e/GJ = 0.453 tCO2-e/MWh. No announced closure date was found for Barker Inlet; AGL’s Torrens Island material instead discusses redevelopment into the Torrens Energy Hub and closure/decommissioning of older Torrens A/B assets. AGL Annual Report 2025 notes non-routine maintenance at Barker Inlet in FY25 but does not disclose generator-specific cost.