Warning: session_start(): Session cannot be started after headers have already been sent in /home/nemstats/web/nemstats.com.au/public_html/lib/admin_auth.php on line 29

Barker Inlet Power Station (BARKIPS1)

Other Generators · AGL Barker Inlet Pty Ltd · Reciprocating Engine - Spark ignition

In Service SA1 Fossil - Natural Gas Pipeline NEM data · 24 hours
210 MW
Registered nameplate capacity
24 hours revenue
$-41
Capacity factor
0.1%
Revenue / MWh
$-7.31
Est. SRMC
$9.00/MWh
MLF
0.9996

Stats window 03 Jun 2026 15:10 → 04 Jun 2026 15:10 AEST

Key information
Capacity
210 MW
Status In Service
Lifecycle Operating
Region SA1
DUID BARKIPS1
Owner AGL Barker Inlet Pty Ltd
Commissioned Jan 2020
Expected closure 2025-07-02
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Fossil - Natural Gas Pipeline
Equipment OEM
Equipment type / model

Dispatch & revenue

03 Jun 2026 15:10 → 04 Jun 2026 15:10 AEST

Revenue (× MLF)
$-41
Dispatched
5.7 MWh
Available
2,041.0 MWh
Curtailed
2,041.0 MWh
Curtailment
100.0%
of available
MLF used
0.9996
end of period

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 1.0001
2025-07-01 0.9996

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
210 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$9.00/MWh
Capex total (greenfield)
$295.00M

How this was derived
Primary owner announcement reports nominal project investment of AUD 295 million for a 210 MW Barker Inlet reciprocating-engine power station.

Reference
AGL announces development of $295m power station in SA (high confidence)

Capex refurbishment
Capex / MW
$1,404,762

How this was derived
Derived unit capex equals AUD 1.405m/MW on the reported nominal project cost and capacity.

Reference
AGL announces development of $295m power station in SA (high confidence)

Capex / MWh storage
Fixed OPEX (annual)
$7.56M

How this was derived
Annual fixed O&M is an estimated technology assumption, not an AGL-reported Barker Inlet cost.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)

Fixed OPEX / MW-yr
$36,000

How this was derived
Used as a technology-specific estimate for Barker Inlet because GHD’s 210 MW dual-fuel reciprocating-engine scenario closely matches Barker Inlet.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)

Variable OPEX / MWh
$9.00

How this was derived
Used as estimated VOM for the Barker Inlet technology class.

Reference
2025 Energy Technology Retirement Cost & O&M Estimate Review (medium confidence)

Fuel cost / GJ
$13.58

How this was derived
Used as a current market proxy because Barker Inlet-specific gas contract prices were not publicly found.

Reference
East coast gas supply outlook worsens July to September 2025, but forward longer-term prices ease (medium confidence)

Heat rate GJ/MWh
8.79

How this was derived
Selected as the most suitable plant-level net heat-rate assumption for Barker Inlet-style reciprocating engines.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Reported capex is AGL's nominal $295 million investment announced in June 2017 and reiterated at construction commencement in February 2018 for a 210 MW, 12-engine Barker Inlet Power Station. AGL's current site says construction commenced in early 2018 and the plant was commissioned in late 2019; South Australian government material states BIPS was commissioned on 4 November 2019, while the provided online date is 2020-01-01. Fixed O&M, variable O&M, heat rate, efficiency, emissions factor and asset life are not publicly disclosed by AGL at generator level; values used are AEMO/GHD defaults for a new-entrant 12 x Wärtsilä reciprocating gas engine plant and should be reviewed if confidential AGL bid/asset data is available. Emissions intensity is calculated as 8.85 GJ/MWh times 53.53 kg CO2e/GJ combustion emissions = 0.474 tCO2e/MWh, excluding upstream fugitive emissions; including GHD's fugitive range of 3.9-13.5 kg CO2e/GJ would imply about 0.508-0.593 tCO2e/MWh. AGL/AECOM 2025 planning material states existing BIPS 1 is fully operational and that AGL is progressing a BIPS 2 variation, with development cost about $500 million and output up to 280 MW; this is expansion/development context, not a closure or refurbishment of BIPS 1. No major refurbishment or closure date for BIPS 1 was found in public sources.

Latest AI note (4 Jun 2026)

Capex is reported nominal AGL project cost for a 210 MW reciprocating-engine gas plant announced/developed in 2017 and under construction in 2018. Capex per MW is calculated as AUD 295m / 210 MW. O&M values are not Barker Inlet actuals; they use AEMO/GHD 2025 bottom-up estimates for a NEM-connected 210 MW dual-fuel reciprocating engine scenario (12 x Wärtsilä 18V50DF), which closely matches Barker Inlet. Aurecon’s 2024 technology review gives a lower fixed O&M assumption of AUD 29,383/MW-year and variable O&M of AUD 8.51/MWh for a similar 209.1 MW net hypothetical project; the GHD 2025 estimate was selected as the profile value because it is a newer AEMO-commissioned O&M review for existing NEM-connected gas technologies. Heat rate and efficiency use Aurecon’s net HHV maximum-load values for the same 12 x 18V50DF-style reciprocating-engine configuration; Wärtsilä’s OEM engine data shows a lower engine-only 50 Hz gas heat rate of 7,285 kJ/kWh and 49.4% electrical efficiency. Emissions intensity is estimated, not directly reported, as 8.79 GJ/MWh HHV net multiplied by the Australian NGA 2024 scope 1 natural gas pipeline factor of 51.53 kg CO2-e/GJ = 0.453 tCO2-e/MWh. No announced closure date was found for Barker Inlet; AGL’s Torrens Island material instead discusses redevelopment into the Torrens Energy Hub and closure/decommissioning of older Torrens A/B assets. AGL Annual Report 2025 notes non-routine maintenance at Barker Inlet in FY25 but does not disclose generator-specific cost.

Sources