Other Generators · Ballarat Health Services · Reciprocating Engine - Compression ignition
03 Jun 2026 22:25 → 04 Jun 2026 22:25 AEST
| Capex total (greenfield) default |
$2.40M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$1,500,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$60,000
Shown in table |
| Variable OPEX / MWh default |
$8.00
Shown in table |
| Fuel cost / GJ default |
$25.00
Shown in table |
| Heat rate GJ/MWh default |
12.00
Shown in table |
Confidence: unknown · Status: needs review · Capex basis: unknown