Bairnsdale (BDL01)

Gas Peakers · Alinta DEBO · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 24 hours
47 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$142.10/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
47 MW

AEMO status In Service
Project status Operational (AI)

Region VIC1
MLF 0.9816
DUID BDL01
Owner Alinta DEBO
Commissioned
Expected closure 2025-07-02
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM
Turbine / engine model
Stats window
03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Dispatch & revenue

03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Revenue (× MLF)
$0
Dispatched
MWh
Available
247.5 MWh
Curtailed
247.5 MWh
Curtailment
100.0%
of available
MLF used
0.9816
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9816
2025-07-01 0.9816

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
47 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$142.10/MWh
Capex total (greenfield)
$103.07M

Shown in table
$103.07M (2026 real AUD)

How this was derived
The capex total is a derived default, not reported Bairnsdale capex; it excludes site-specific land, development and fuel connection costs.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$2,193,000

Shown in table
$2.19M (2026 real AUD)

How this was derived
Because Bairnsdale-specific construction capex was not found, the AEMO/Aurecon 2024 small-GT OCGT EPC benchmark was used as a default capex proxy for a 47 MW unit.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$816.3k

Shown in table
$816.3k (2026 real AUD)

How this was derived
Annual fixed O&M is a derived default for the 47 MW BDL01 unit.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$17,368

Shown in table
$17.4k (2026 real AUD)

How this was derived
Small-GT OCGT fixed O&M benchmark used as a default due to absence of Bairnsdale-specific fixed O&M disclosure.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$16.10

Shown in table
$16.10 (2026 real AUD)

How this was derived
Small-GT OCGT variable O&M benchmark used as a default; actual Bairnsdale maintenance cost may vary with starts and OEM contract terms.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$12.00

Shown in table
$12.00 (2026 real AUD)

How this was derived
AEMO's 2024 generic east-coast gas price forecast is used as an estimated fuel price because no Bairnsdale-specific gas supply price was found.

Reference
2024 Forecasting Assumptions Update (medium confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh
10.50

Shown in table
$10.50 (2026 real AUD)

How this was derived
AEMO provides generator-specific heat-rate parameters for Bairnsdale; static heat rate is used for the profile.

Reference
AEMO Heat Rate Data (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
Bairnsdale Power Station is verified as an operating 94 MW natural-gas-fired peaking station; BDL01 is one 47 MW unit. No original 2001 construction capex for BDL01/Bairnsdale was found in public sources, so capex is a default 2024 new-build small OCGT EPC proxy from Aurecon/AEMO applied to the 47 MW DUID. The capex proxy excludes land/development and fuel connection costs and includes assumptions not necessarily applicable to Bairnsdale, including liquid fuel storage and hydrogen capability. Fixed and variable O&M are also default small-GT values from Aurecon/AEMO. Heat rate is AEMO's Bairnsdale static HHV as-generated heat rate. Efficiency is calculated as 3.6/10.50. Emissions intensity is calculated from AEMO heat rate and the 2025 Australian NGA factor for pipeline natural gas of 51.53 kg CO2-e/GJ. AEMO variable heat-rate data for Bairnsdale also gives base heat input 127.83 GJ/h and incremental heat rate 7.78 GJ/MWh. No public closure date or major Bairnsdale-specific refurbishment announcement was found; AEMO PFR reporting shows BDL01 and BDL02 required PFR settings by 30 June 2021, and Alinta's current generation page lists Bairnsdale as operating.