Australia Plains Solar Farm

Solar · Gree · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
200/400 MW
Researched capacity / storage
Est. SRMC
$0.00/MWh
Key information
Capacity (AI)
200 MW / 400 MWh

Green Gold Energy project page (2025) states 'Proposed Capacity 200 MW + 400MWh' for the Australia Plains Solar Farm.

AEMO status Publicly Announced
Project status Development (AI)

Green Gold Energy project page (2025) says the Australia Plains Solar Farm is 'Under-development' and received development approval on 6 Feb 2025.

DUID
Owner Gree
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
03 Jun 2026 23:55 → 04 Jun 2026 23:55 AEST

Dispatch & revenue

03 Jun 2026 23:55 → 04 Jun 2026 23:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Utility scale solar pv single axis tracking
Capacity
200 MW / 400 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$324.14M

Shown in table
$324.14M (2026 real AUD)

How this was derived
No site-specific capex was found; GHD/AEMO provides a close technology-and-size match for estimating Australia Plains solar-only capex.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$1,620,710

Shown in table
$1.62M (2026 real AUD)

How this was derived
Per-MW AC value is calculated from the GHD/AEMO 200 MW AC representative project total.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$2.88M

Shown in table
$2.88M (2026 real AUD)

How this was derived
Representative large-scale solar PV O&M assumption provides the annual fixed O&M estimate for a 240 MW DC / 200 MW AC plant.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$14,400

Shown in table
$14.4k (2026 real AUD)

How this was derived
Schema value is normalised to AUD/MW AC/year while preserving GHD's DC-basis assumption in the excerpt.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Separate variable O&M is not modelled; it is included in fixed O&M.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Solar PV uses solar irradiance rather than a purchased fuel, so fuel cost is set to zero.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Heat rate is not meaningful for photovoltaic generation, so it is left null.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No project-specific capex, O&M contract, PPA or financing disclosure was found in public sources. Capex and O&M are therefore estimated from AEMO/GHD 2025 technology assumptions for a representative 200 MW AC / 240 MW DC single-axis tracking utility-scale solar PV project, excluding BESS. Estimated capex comprises EPC cost AUD 259.4m plus land/development AUD 64.742m = AUD 324.142m nominal 2025 basis. Fixed O&M is GHD/AEMO's AUD 12,000/MW DC/year, applied to 240 MW DC = AUD 2.88m/year, equivalent to AUD 14,400/MW AC/year for the 200 MW AC export capacity. Variable O&M is treated as AUD 0/MWh because GHD states it is included in fixed O&M. The official project scope includes 200 MWac solar plus 400 MWh BESS; the provided generator record shows storage blank, and the financial values here are for the solar generator only. GHD notes major refurbishment is likely to involve inverter refurbishment/replacement at about half-life and possible expenditure on tracking drive mechanisms; modules are generally assumed not to be replaced except for faults/failures. AEMO's 2025 SAER lists Australia Plains Solar Farm as a publicly announced 200 MW solar farm with storage capacity NA, while Green Gold Energy materials describe the broader APSP as 200 MWac solar plus 400 MWh BESS with DA on 6 February 2025 and an 18-month construction period.