Appin (APPIN)

Coal · EDL CSM NSW Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service NSW1 Fossil - Waste Coal Mine Gas NEM data · 24 hours
56 MW
Registered nameplate capacity
Est. SRMC
$8.51/MWh
Key information
Capacity
56 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
Coordinates —

DUID APPIN
Owner EDL CSM NSW Pty Ltd
Commissioned —
Expected closure 2036
Closure date —
Technology Reciprocating Engine - Spark ignition
Fuel Fossil - Waste Coal Mine Gas
Plant supplier —
Boiler / turbine equipment —
Stats window
24 Sep 2026 08:25 → 25 Sep 2026 08:25 AEST

Dispatch & revenue

24 Sep 2026 08:25 → 25 Sep 2026 08:25 AEST

No dispatch data for DUID APPIN in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste coal mine gas reciprocating engine - spark ignition
Capacity
56 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$8.51/MWh
Capex total (greenfield)
$59.17M

Shown in table
$59.17M (2026 real AUD)

Capex refurbishment
—
Capex / MW derived
$1,063,830

Shown in table
$1.06M (2026 real AUD)

Fixed OPEX (annual)
$1.63M

Shown in table
$1.63M (2026 real AUD)

Fixed OPEX / MW-yr
$29,383

Shown in table
$29.4k (2026 real AUD)

Variable OPEX / MWh
$8.51

Shown in table
$8.51 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
10.29

Shown in table
$10.29 (2026 real AUD)

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 02 Jun 2026

Notes
Appin-specific public financial data is limited. The reported capex found is for the combined Appin and Tower project: $100 million, 94 MW, 94 Caterpillar G3516 generator sets, project began May 1995. The capex value here allocates that reported nominal project cost to the APPIN DUID using 55.62 MW / 94 MW; therefore capex_basis is estimated, not reported. O&M values are not generator-specific and use the AEMO/Aurecon 2024 reciprocating-engine default assumptions. Heat rate/efficiency is estimated from Caterpillar G3516-class gas generator ratings rather than Appin test data. Emissions intensity uses a third-party presentation of Clean Energy Regulator NGER facility data for Appin CSM Power Station; older public sources show different intensities, so this should be reviewed against the CER table before investment-grade use. Major refurbishment/maintenance evidence exists: EDL had a purpose-built Appin engine rebuild facility opened in 2002 and reported overhauls, and Caterpillar/World Coal reported high engine operating hours without major overhaul. Contract/closure: no explicit AEMO closure notice was found in web-search snippets; Appin/Tower recontracted for a further 18 years in 2015/2016, with contract end date shown as 2034, while the current mine owner/operator has changed since South32’s 2024 sale of Illawarra Metallurgical Coal.