Coal · EDL CSM NSW Pty Ltd · Reciprocating Engine - Spark ignition
03 Jun 2026 16:30 → 04 Jun 2026 16:30 AEST
| Capex total (greenfield) |
$59.17M
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,063,830
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$1.63M
|
| Fixed OPEX / MW-yr |
$29,383
|
| Variable OPEX / MWh |
$8.51
|
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
10.29
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 02 Jun 2026
Notes
Appin-specific public financial data is limited. The reported capex found is for the combined Appin and Tower project: $100 million, 94 MW, 94 Caterpillar G3516 generator sets, project began May 1995. The capex value here allocates that reported nominal project cost to the APPIN DUID using 55.62 MW / 94 MW; therefore capex_basis is estimated, not reported. O&M values are not generator-specific and use the AEMO/Aurecon 2024 reciprocating-engine default assumptions. Heat rate/efficiency is estimated from Caterpillar G3516-class gas generator ratings rather than Appin test data. Emissions intensity uses a third-party presentation of Clean Energy Regulator NGER facility data for Appin CSM Power Station; older public sources show different intensities, so this should be reviewed against the CER table before investment-grade use. Major refurbishment/maintenance evidence exists: EDL had a purpose-built Appin engine rebuild facility opened in 2002 and reported overhauls, and Caterpillar/World Coal reported high engine operating hours without major overhaul. Contract/closure: no explicit AEMO closure notice was found in web-search snippets; Appin/Tower recontracted for a further 18 years in 2015/2016, with contract end date shown as 2034, while the current mine owner/operator has changed since South32’s 2024 sale of Illawarra Metallurgical Coal.