Other Generators · Snowy Hydro Ltd · Reciprocating Engine - Compression ignition
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
03 Jun 2026 16:45 → 04 Jun 2026 16:45 AEST
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0094 |
| 2025-07-01 | 1.0073 |
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
—
|
| Variable OPEX / MWh |
—
|
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 02 Jun 2026
Notes
Data for Angaston is limited; estimates based on technology type defaults are used where specific data is unavailable.