Adelaide Desalination Plant (ADPPV2)

Solar · South Australian Water Corporation · Solar PV - Fixed

Operational AEMO: In Service SA1 Solar - Solar NEM data · 24 hours
14 MW
Registered nameplate capacity
Est. SRMC
$0.00/MWh
Key information
Capacity
14 MW
AEMO status In Service
Project status Operational (AI)

Region SA1
DUID ADPPV2
Owner South Australian Water Corporation
Commissioned Jul 2022
Expected closure 2025-07-02
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 18:00 → 04 Jun 2026 18:00 AEST

Dispatch & revenue

03 Jun 2026 18:00 → 04 Jun 2026 18:00 AEST

No dispatch data for DUID ADPPV2 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar PV
Capacity
14 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$20.00M

Shown in table
$20.00M (2026 real AUD)

Capex refurbishment
Capex / MW derived
$1,454,545

Shown in table
$1.45M (2026 real AUD)

Fixed OPEX (annual)
$500.0k

Shown in table
$500.0k (2026 real AUD)

Fixed OPEX / MW-yr
$36,364

Shown in table
$36.4k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 02 Jun 2026

Notes
The fixed O&M costs are based on industry standards for solar PV systems. The emissions intensity is based on the renewable nature of solar energy.

Sources