← Asset Watch · Generator profile

Gundary Solar Farm - KCI

NSW · BESS ·
Data unavailable
Net SCADA
—
Declared availability
—
Regional price
—
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (NSW). One row per site — DUIDs at the same site are combined and energy-weighted. Period 4 Nov 18:44 – 5 Nov 18:44 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Gundary Solar Farm - KCI (this asset) 0.0 — 0.0 — —
Broken Hill 45.8 $3.39/MWh 34.2 $94.30/MWh +$90.92/MWh
Capital Battery 260.2 $5.46/MWh 200.5 $84.37/MWh +$78.92/MWh
Darlington Point Energy Storage System 48.7 $13.34/MWh 33.1 $98.95/MWh +$85.61/MWh
Eraring Big Battery 1,638.2 $1.89/MWh 1,567.9 $103.03/MWh +$101.15/MWh
Liddell BESS 990.9 $1.79/MWh 750.2 $98.77/MWh +$96.98/MWh
Limondale BESS 488.4 $3.10/MWh 312.2 $92.54/MWh +$89.44/MWh
New England Solar Farm BESS 390.8 $4.36/MWh 240.6 $106.89/MWh +$102.52/MWh
Orana BESS 1,802.5 $-0.54/MWh 1,362.3 $100.18/MWh +$100.72/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.