← Asset Watch · Generator profile

Dartmouth

VIC · Hydro · DARTM1
As of 5 Nov 02:30 NEM time (AEST) · SCADA current
Latest output
0.0 MW
Declared availability (next-day)
158.0 MW
Regional price
$75.63/MWh

Aligned 5-minute series in NEM time (AEST). Coverage 93% of expected intervals.

Material events

No recent material events.

Peer comparison

Same technology (Hydro) and region (VIC). One row per site — DUIDs at the same site are combined and energy-weighted. Period 4 Nov 02:35 – 5 Nov 02:35 NEM time. Coverage 93%. Interval energy (max(0, SCADA MW) × 5/60 h) times the regional reference price, divided by that energy. A spot-market metric, not realised revenue.

Asset Energy MWhGeneration-weighted spot
Dartmouth (this asset) 0.0 —
Bogong / Mackay 0.4 $30.36/MWh
Clover 0.0 $-7.00/MWh
Eildon (2 units) 0.0 —
Hume Dam VIC 0.0 —
Murray 1 1,996.7 $124.57/MWh
Murray 2 1,996.7 $124.57/MWh
Rubicon Mountain Streams 118.6 $31.30/MWh

Detection defaults for Hydro

Availability drop 20.0 MW or 15%; output drop 25.0 MW or 20%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.